
The boom arm is the hypotenuse, the distance r from the outrigger base to the load is the long arm of the triangle, and the vertical height h of the boom "tip" above the ground is the short arm of the hypotenuse. The crane boom, the field, and the vertical cable form a right triangle when viewed from one side. The load moves upward when the motor drives T above this point, assuming the cable is strong enough to withstand the power. Instead, when the crane's upward force precisely balances the weight of the load, a tension T (force per unit length) is preserved in the rope. There are no horizontal forces since the load ( mass times gravity g, or 9.8 m/s2) is lifted vertically (windy days play havoc for crane operators). The boom arm stretches upward and outward at a set angle for the entirety of its length, with an apparatus at the end that raises and moves the load. When considering crane installation, one needs to also look for the capacity of the crane to avoid mishaps and risks related to the overloading of crane installation.Ī crane is controlled from an outrigger foundation, a movable and rotating platform that can be several metres high.

For the load chart, you will need to locate the Crane Capacity index. The crane load capacity is determined to ensure a healthy working environment and enable the project to move forward smoothly.

This number must be recalculated each time a crane is used since it varies depending on the location of the hoist and the lift radius, among other factors.Ĭrane load capacity is one of the essential considerations in any construction project. Knowing the crane load capacity is critical for safely operating a crane without lowering the load or damaging the machine.
